Service Impacts
| Location | Area | Start | Finish | Repair Type | Repair Description | Service Impact Type | Contact Person | Contact Phone |
|
|---|---|---|---|---|---|---|---|---|---|
| Patuxent Building, Electrical Outage | Entire Building. | 11-29-2025 6:00 am | 11-29-2025 3:30 pm | Electrical Outage | To perform maintenance on the building's electrical distribution equipment. | Planned | Randolph Bayer | 301-356-7812 | |
| Jull Hall, Yahentamitsi Dining Hall - Electrical Outage | Entire Building(s). | 11-29-2025 6:00 am | 11-29-2025 3:30 pm | Electrical Ouage | To perform maintenance on the electrical distribution equipment that supplies power to both the Jull Hall and Yahentamitsi Dining Hall buildings. | Planned | Randolph Bayer | 301-356-7812 | |
| Clarice Smith Performing Arts Center, Domestic Water Outage | Entire Building. | 11-26-2025 6:00 am | 11-26-2025 2:00 pm | Domestic Water Outage | To replace the building's faulty domestic water meter as well as the isolation and bypass valves. | Planned | Jason Reardon | 240-694-8431 | |
| Research Greenhouse, Electrical Outage | Entire Building. | 11-22-2025 6:00 am | 11-22-2025 3:30 pm | Electrical Outage | To perform maintenance on the building's electrical distribution equipment. | Planned | Randolph Bayer | 301-356-7812 | |
| Atlantic Building, Domestic Cold Water Outage | Wing #4 of the Building. | 11-20-2025 4:00 pm | 11-20-2025 10:00 pm | Domestic Cold Water Outage | Replace the building's faulty domestic water meter and the isolation valves. | Planned | Jason Reardon | 240-694-8431 | |
| South Campus Dining Hall, Fire Alarm/Suppression Testing and Inspection | Entire Building | 11-19-2025 6:00 am | 11-19-2025 3:00 pm | Fire Alarm/Suppression Testing and Inspection | Fire Alarm and Suppression Testing and Inspection | Planned | Clarence Brown | 301-405-0134 | |
| Marie Mount Hall, Fire Alarm/Suppression Testing and Work | Rooms #3415, #3419 | 11-19-2025 6:00 am | 11-19-2025 7:00 am | Fire Alarm/Suppression Testing and Work | To conduct testing and work on the building's fire alarm, sprinkler, and suppression system in these two rooms. | Planned | Cornell Jones | 240-882-5588 | |
| Energy Research Facility , Fire Alarm/Suppression Testing and Inspection | Entire Building | 11-18-2025 6:00 am | 11-18-2025 3:00 pm | Fire Alarm/Suppression Testing and Inspection | Fire Alarm and Suppression Testing and Inspection | Planned | Clarence Brown | 301-405-0134 | |
| E.A. Fernandez IDEA Factory, Fire Alarm/Suppression Testing and Inspection | Entire Building | 11-17-2025 6:00 am | 11-17-2025 3:00 pm | Fire Alarm/Suppression Testing and Inspection | Fire Alarm and Suppression Testing and Inspection | Planned | Clarence Brown | 301-405-0134 | |
| Kim Engineering Building, Electrical Outage | Corridors in wing #1 on the third floor of the building: #3193, #3190, #3188, and #3195. | 11-17-2025 4:00 am | 11-17-2025 6:00 am | Electrical Outage | To install a new 480V breaker for lab equipment in the building. | Planned | Joe Kselman | 301-405-1992 | |
| William E. Kirwan Hall Electrical Outage | Building | 11-15-2025 6:00 am | 11-15-2025 3:30 pm | Electric Outage | Preventative Mainteance | Planned | Randy Bayer | Randy Bayer | |
| Architecture Building Fire Alarm Testing/Suppression Work | Entire Building | 11-14-2025 6:00 am | 11-14-2025 3:00 pm | Fire Alarm/Suppression Testing and Inspection | Fire alarm testing | Planned | Clarence Brown | 3014050134 | |
| Architecture Building, Fire Alarm/Suppression Testing and Inspection | Entire Building | 11-14-2025 6:00 am | 11-14-2025 3:00 pm | Fire Alarm/Suppression Testing and Inspection | Fire Alarm and Suppression Testing and Inspection | Planned | Clarence Brown | 301-405-0134 | |
| Wind Tunnel Building, Exterior Painting | North and south exterior areas of the building. | 11-03-2025 8:00 am | 11-15-2025 4:00 pm | Exterior painting | A contractor will prepare, prime, and paint some exterior windows, doors, and oxygen tanks as shown on the map. | Planned | Rolando Mendez | 301-852-1308 |
| Location | Area | Start | Finish | Repair Type | Repair Description | Service Impact Type | Contact Person | Contact Phone |
|
|---|---|---|---|---|---|---|---|---|---|
| Purple Line Construction Overnight Lane Closures - Campus Dr. & Regents Dr. Intersection | Campus Drive and Regents Drive | 11-17-2025 7:00 pm | 11-18-2025 3:00 am | Purple Line Construction | Purple Line Construction | Planned | Casey Ferraro | 301-405-9168 | |
| Purple Line Construction Baltimore Avenue – Shifting Lane Closures | Baltimore Avenue between Hotel Drive and Fraternity Row | 11-17-2025 9:00 am | 11-21-2025 4:00 pm | Purple Line Construction | Purple Line Construction | Planned | Casey Ferraro | 301-405-9168 | |
| Purple Line Construction Campus Drive - Lane Closures | Campus Drive between Rossborough Lane (near the Leonardtown Apartments) and the College Park Metro parking garage | 11-15-2025 7:00 am | 12-08-2025 7:00 pm | Purple Line Construction | Purple Line Construction | Planned | Casey Ferraro | 301-405-9168 | |
| Purple Line Construction | Campus Drive & Regents Drive - Lane Closures | 11-14-2025 8:30 am | 11-14-2025 3:30 pm | Purple Line Construction | Purple Line Construction | Planned | Casey Ferraro | 301-405-9168 | |
| Purple Line Construction | Overnight Closures at Union Dr. & Alumni Dr. Intersection | 11-13-2025 7:00 pm | 11-14-2025 6:00 am | Purple Line Construction | Purple Line Construction | Planned | Casey Ferraro | 301-405-9168 | |
| Purple Line Construction | Baltimore Avenue between Hotel Drive and Fraternity Row | 11-12-2025 9:00 am | 11-14-2025 4:00 pm | Purple Line Construction | Purple Line Construction | Planned | Casey Ferraro | 301-405-9168 | |
| Purple Line Construction, Campus Drive - Overnight Lane Closures | Campus Drive between Rossborough Lane (near the Leonardtown Apartments) and the Metro parking garage. | 11-10-2025 7:00 pm | 11-15-2025 6:00 am | Purple Line Construction | Purple Line Construction | Planned | Casey Ferraro | 301-405-9168 | |
| Centerville Hall Sidewalk Closure | Exterior Sidewalk | 11-10-2025 7:00 am | 11-30-2025 5:00 pm | Exterior Sidewalk Closure | Concrete repair | Planned | Charles Patterson | 3017895078 | |
| Van Munching Hall, Sidewalk Closure | Exterior West Courtyard Area. | 11-10-2025 7:00 am | 11-21-2025 4:30 pm | Sidewalk Closure | To install a bike pad in the west courtyard and a bike pad outside of the entrance to the western courtyard of the building. | Planned | Frank Dudley | 301-832-0943 | |
| Edward St. John Learning and Teaching Center, Sidewalk Closure | Exterior Northwest Corner of the Building | 11-10-2025 7:00 am | 11-21-2025 4:30 pm | Sidewalk Closure | To install a bike pad at the northwest corner of the building. | Planned | Frank Dudley | 301-832-0943 | |
| Glenn L. Martin Hall, Sidewalk Closure | Southeast entrance to the building. | 11-03-2025 7:00 am | 11-14-2025 5:00 pm | Sidewalk Closure | To repair and secure loose railings on the steps and surrounding areas at the southeast entrance. | Planned | Charles Patterson | 301-789-5078 | |
| Purple Line Construction | University Boulevard between Temple Street and Adelphi Road (near Graduate Hills Apartments) • Adelphi Road between Tulane Drive and University Boulevard (near Graduate Hills Apartments and UMGC) • Campus Drive between Adelphi Road and Presidential | 11-01-2025 7:00 am | 01-26-2026 12:00 pm | Purple Line Construction | Purple Line Construction | Planned | Casey Ferraro | 301-405-9168 | |
| Industrial Lane - Parking Lot/Space Closure, Sidewalk Closure, Roadway Closure | Industrial Lane, between ANSC #142 and Chem-Nuc #090 | 10-28-2025 6:00 am | 12-12-2025 5:00 pm | Sidewalk Closure, Roadway Closure, Parking Lot Closure, Parking Space Closure | To install new underground condensate piping underneath Industrial Lane as part of the NextGen energy improvement projects. | Planned | Chrysanthe Broikos | 301-956-6155 | |
| Purple Line Construction Rossborough Lane – Periodic Lane Closures | Rossborough Lane | 09-22-2025 7:00 am | 12-22-2025 5:00 am | Purple Line | Purple Line Construction | Planned | Casey Ferraro | 3014059168 | |
| Purple Line Construction Campus Drive | Periodic Lane Closures – Core of Campus | 09-15-2025 7:00 am | 12-22-2025 5:00 pm | Purple Line Construction | Purple Line Construction | Planned | Casey Ferraro | 301-405-9168 | |
| Fieldhouse Drive Sidewalk Closure | Sidewalk Closure | 08-18-2025 12:00 am | 11-15-2025 12:00 am | Exterior Sidewalk Closure | Scub 3 Renovations | Planned | Al Neshati | 3014054454 | |
| Parking Lot #GG1 - Partial Parking Lot Closure, Sidewalk Closure | East side of the A.V. Williams Building | 08-01-2025 5:00 am | 04-15-2026 5:00 pm | Partial Parking Lot, Sidewalk Closure | To install the new cooling tower north of the electric pad at the #GG1 parking lot. | Planned | Tim Zhao | 240-383-2431 |
| Location | Area | Start | Finish | Repair Type | Repair Description | Service Impact Type | Contact Person | Contact Phone |
|
|---|---|---|---|---|---|---|---|---|---|
| Centreville Hall #098 | Elevator Car #4 | 09-05-2025 12:03 pm | Elevator Repairs | Modernization of Elevator #4 | Planned | Shane Kogok | 301-405-2222 | ||
| Prince Frederick Hall #425 | Elevator Car #5 | 01-31-2025 2:37 pm | Flood water damage | Water flood damage | Emergency | Shane Kogok | 443-758-7260 |