Fall 2011 and Beyond Planning Period
Academic Facilities
PLANNED NEW CONSTRUCTION
Site District Project NASF GSF Cost* Potential
Fund Source
N35 W New Journalism Building 35,300 64,200 $19,500 State
N36 NE New Computer Science & Engineering Building 100,000 182,000 $54,200 State
N37 SW BSOS Research Facility II 66,740 120,000 $30,000 State
N38 NE Engineering Research Laboratory Building (addition to Engineering Lab Bldg) 44,000 80,000 $24,000 State
N39 HC Nutrition and Food Sciences Building 22,000 40,000 $12,000 State
N40 NE Animal Science Teaching Arena 16,000 18,200 $2,300 State
N41 N Chesapeake Bay Mesocosm 7,400 8,000 $1,100 Private
N42 W Benjamin Building Addition- Phase I 46,500 85,000 $27,100 State
N43 W Benjamin Building Addition- Phase II 46,500 85,000 $27,100 State
N44 SW New Humanities & Fine Arts Building 64,000 112,300 $28,700 State
N45 NE Life Sciences Library 76,147 122,800 $30,700 State
N46 NE Physical Sciences Complex - Phase I 155,000 282,000 $75,900 State
N47 SW New School of Public Affairs Building 40,000 72,700 $22,500 State
N48 NW Biological Sciences Research Building - Phase II 69,095 125,600 $54,800 State
N49 SW Architecture Building Addition 48,074 84,300 $22,800 State
N50 NE Engineering Lab Building Replacement 71,500 130,000 $41,600 State
N51 NE Physical Sciences Complex - Phase II 90,000 163,600 $44,000 State
N52 NE Biosciences Research Support Facility 40,000 76,900 $41,200 State
18   TOTAL 1,038,256 1,852,600 $559,500  


PLANNED BUILDING RENEWAL
Site District Project NASF GSF Cost* Potential
Fund Source
R14 NE Renovation of Physics Building 140,505 237,826 $47,600 State
R15 NE Renovation of Geology Building (converted to other use) 11,870 24,390 $4,400 State
R16 NE Biology-Psychology Building Renovation 146,297 250,240 $52,000 State
R17 SW Architecture Building Renovation 44,490 67,163 $9,400 State
R18 HC Journalism Building Renovation 14,389 22,647 $4,100 Facilities Renewal
R19 W Benjamin Building Renovation 73,599 112,505 $15,800 State
r6 NE Animal Sciences - Wing 1 Renovation 31,142 62,462 $11,200 State
r7 NE Renovation of Energy Research (old wing) 15,741 21,956 $3,100 State
r8 NE Chemistry Building Renovation - Wings 1 & 2 107,600 183,700 $38,200 State
r9 HC H. J. Patterson Building Renovation 59,700 89,700 $20,700 State
r10 HC Symons Hall Renovation (center & north wings) 33,634 54,753 $5,400 State
r11 NW Health and Human Performance Court Conversion TBD 30,800 $5,400 State
r12 NE Hornbake Ground and First floors Renovation (College of Information Services) 17,915 30,018 $3,200 Facilities Renewal
r13 NE Engineering/Science Library Expansion 4,947 8,400 $1,200 Facilities Renewal
r14 NW Renovation of Computer & Space Sciences (East Wing infrastructure upgrades) 47,627 78,104 $7,000 State
r15 SW Van Munching Hall Renovation 18,600 34,900 $4,900 State
16   TOTAL 768,056 1,309,564 $233,600  


Fall 2011 and Beyond Planning Period
Academic Support Facilities
PLANNED NEW CONSTRUCTION
Site District Project NASF GSF Cost* Potential
Fund Source
N53 HC Service Learning Center 10,000 18,200 $5,100 Private
N54 NE New IT Building 59,000 100,000 $33,500 State
2   TOTAL 69,000 118,200 $38,600  


PLANNED BUILDING RENEWAL
Site District Project NASF GSF Cost* Potential
Fund Source
R20 HC Shoemaker Renovation 16,072 23,383 $3,300 Facilities Renewal
R21 HC Memorial Chapel Renovation 15,963 25,776 $2,300 Institutional
r16 HC Mitchell Building Renovation 28,406 19,840 $5,100 Institutional
r17 HC Lee Building Renovation 14,169 20,662 $3,700 Institutional
r18 HC Armory Renovation (Ground Floor) - Student Services 21,597 35,541 $6,400 Institutional
5   TOTAL 96,207 125,202 $20,800  


Fall 2011 and Beyond Planning Period
Auxiliary Enterprise Facilities
PLANNED NEW CONSTRUCTION
Site District Project NASF GSF Cost* Potential
Fund Source
N55 NW Byrd Stadium expansion (add 12,000 seats & sky boxes) N/A N/A $8,000 System/Private
N56 NW Indoor Practice Facility with rooftop fields 100,000 120,000 $26,000 System/Private
N57 N New Baseball Stadium 5,700 11,700 $7,000 System/Private
N58 NW Soccer Stadium 2,000 3,200 $4,900 System/Private
N59 N Paint Branch Drive Parking Garage (1,800 spaces) N/A 630,000 $21,000 System
5   TOTAL 107,700 764,900 $66,900  


PLANNED BUILDING RENEWAL
Site District Project NASF GSF Cost* Potential
Fund Source
R22 HC Worcester Hall Renovation 22,160 33,541 $6,300 System
R23 SW South Campus Dining Hall Renovation 92,525 133,845 $24,100 System
R24 HC Dorchester Hall Renovation 23,712 35,436 $6,500 System
R25 W Centreville Hall Renovation 76,402 128,198 $11,500 System
R26 W Cumberland Hall Renovation 75,635 124,486 $11,200 System
R27 W Bel Air Hall Renovation 17,756 29,090 $2,600 System
R28 W Chestertown Hall Renovation 16,928 29,090 $2,600 System
R29 W Cambridge Hall Renovation 34,675 55,792 $5,000 System
R30 W Cole Student Activities Building Renovation 176,252 248,809 $62,200 System
9   TOTAL 536,045 818,287 $132,000  


Fall 2011 and Beyond Planning Period
Public-Private Partnership Facilities
PLANNED NEW CONSTRUCTION
Site District Project NASF GSF Cost* Potential
Fund Source
N60 E East Campus Mixed Use Development - Phase II (on new Leonardtown Site) 255,500 365,000 $73,000 PPP
1   TOTAL 255,500 365,000 $73,000  


Fall 2011 and Beyond Planning Period
Infrastructure Improvements
PLANNED NEW CONSTRUCTION
Site District Project NASF GSF Cost* Potential
Fund Source
I18 W Roadway Improvements (Presidential Drive and Regents Drive) N/A N/A $1,200 State, Institutional, Private
I19 C Security and Safety Systems: Infrastructure N/A N/A $2,900 State
I20 C Clean and Redundant power: Infrastructure N/A N/A $3,700 State
I21 C Heating and Cooling: Infrastructure N/A N/A $3,800 State
I22 C Campuswide Pedestrian & Way Finding Improvements - Phase III N/A N/A $850 State, Institutional, Private
4   TOTAL N/A N/A $12,450  


Fall 2011 and Beyond Planning Period
Landscape Improvements
PLANNED NEW CONSTRUCTION
Site District Project Cost* Potential
Fund Source
L17 HC Campus Malls/Quads - Phase III (McKeldin Amphitheater) $400 State, Institutional, Private
L18 NE Athletic Fields - Phase III (New Practice Field) $800 System, Private
L19 OP Campuswide Creek Improvements - Phase III (College Park Woods Stream Restoration) $1,000 State, Institutional, Private
L20 N Campus Ponds - Phase III (Storm Water Pond - Metzerott Gate) $700 State, Institutional, Private
L21 NE Campus Ponds - Phase III (Storm Water Pond Restoration) $150 State, Institutional, Private
L22 NW Athletic Fields - Phase III (ICA Practice Fields) $2,600 System, Private
L23 SW Campus Malls/Quads - Phase III (North-South Mall in S.W. District - Phase II) $2,400 State, Institutional, Private
L24 W Athletic Fields - Phase III (Residential Recreation Field) $400 System
L25 N Athletic Fields - Phase III (Ludwig Track & Field Relocation) $5,000 System, Private
9   TOTAL $13,450  


Fall 2011 and Beyond Planning Period
Projects Located Off-Campus
PLANNED NEW CONSTRUCTION
Site District Project NASF GSF Cost* Potential
Fund Source
N61 OP High Density Library Storage Facility 11,000 12,000 $3,100 State
N62 OP New Storage Facility 28,000 41,000 $6,600 System
2   TOTAL 39,000 53,000 $9,700  


Fall 2011 and Beyond Planning Period
Demolitions/Removals
PLANNED DEMOLITIONS/REMOVALS
Building
Number
District Building NASF GSF Reason for Demolition
045 NE Instruction Television Facility 2,735 3,085 Site for new facility
054 SW Preinkert Field House 19,837 28,592 Site for new facility
085 NE IPST 17,669 28,534 Site for new facility
086 NE IPST Storage 580 1,014 Site for new facility
089 NE Engineering Laboratory Builidng 63,191 84,173 Site for new facility
093 NE Engineering Annex 8,329 11,291 Site for new facility
227 NW Jull Hall 9,318 17,574 Site for new facility
102 NE Agriculture Shed 2,229 2,416 Site for new facility
103 NE Animal Science Services Building 1,026 1,480 Site for new facility
104 W Special Education Trailer 559 733 Site for new facility
105 W Special Education Trailer 559 733 Site for new facility
108 NE Horse Barn 6,617 7,068 Site for new facility
109 NE Sheep Barn 5,339 5,680 Site for new facility
110 NE Cattle Barn 6,587 8,394 Site for new facility
114 NW Poultry Garage (neast of Apiary) 445 578 Site Development Project
119 NE Blacksmith Shop 926 960 Site for new facility
149 NW Cottage 2 1,713 2,009 Site Development Project
150 NW Cottage 3 1,713 2,009 Site Development Project
151 NW Cottage 4 1,713 2,009 Site Development Project
152 NW Cottage 5 1,713 2,009 Site Development Project
153 NW Cottage 6 1,713 2,009 Site Development Project
154 NW Cottage 7 1,713 2,009 Site Development Project
155 NW Cottage 8 1,713 2,033 Site Development Project
156 NW Apiary 1,680 2,082 Site Development Project
158 NW Varsity Sports Teamhouse 12,504 18,320 Site for new facility
159 NW Shipley Field House 1,541 2,830 Site for new facility
244 E Leonardtown Apartment 13,452 15,654 Site for new facility
245 E Leonardtown Apartment 13,452 15,654 Site for new facility
246 E Leonardtown Apartment 13,452 15,654 Site for new facility
247 E Leonardtown Apartment 13,452 15,654 Site for new facility
248 E Leonardtown Apartment 13,452 15,654 Site for new facility
249 E Leonardtown Apartment 13,452 15,654 Site for new facility
250 E Leonardtown Apartment 3,660 7,280 Site for new facility
332 N Anacostia Building (Metzerott Road) 1,423 1,869 Site Development Project
369 NW Byrd Stadium Building 3,319 3,662 Site for new facility
35   TOTAL 262,776 346,359  


Undesignated Building Sites
Site District Functional Use NASF GSF Number of Floors*
N62 NE Academic 71,000 125,000 4
N63 NE Academic 97,000 170,000 4
N64 NE Academic 43,000 75,000 2-4
N65 NE Science 33,000 60,000 1-2½
N66 NW Academic 51,000 90,000 5*
N67 NW Academic 63,000 110,000 5*
N68 NW Academic/Special 77,000 135,000 5*
N69 NW Academic/Special 51,000 90,000 5*
N70 NW Special 10,000 18,000 2
N71 NW Athletic 26,000 45,000
N72 W Arts 28,000 50,000 2
N73 W Special 32,000 56,000 1-3
N74 W Housing 165,000 235,000 3
N75 W Academic 46,000 80,000 4
N76 W Academic 63,000 110,000 4
N77 W Academic 63,000 110,000 4
N78 W Special 100,000 175,000 12
N79 W Academic 94,000 165,000 4
N80 W Academic 30,000 52,000 4
N81 W Academic 105,000 185,000 4
N82 W Academic 46,000 80,000 4
N83 W Academic 57,000 100,000 4
N84 N Special 24,000 42,000 1-2
N85 N Special 46,000 80,000 4
N86 OP Parking Garage (1,400 spaces) N/A 405,000 5 Parking Levels
N87 OP Science 16,000 30,000 2
N88 OP Science 26,000 48,000 4
N89 OP Science 26,000 48,000 4
N90 SW Academic 71,000 125,000 4
N91 OP Science 5,000 10,000 1
N92 OP Science 14,000 26,000 1
N93 OP Housing 193,000 275,000 4
N94 SW Special 28,000 50,000 2
N95 SW Special 28,000 45,000 2
N96 HC Special 35,000 65,000 4
N97 HC Residential 21,000 30,000 3
L26 W Academic Mall & Pond N/A N/A N/A
37   TOTAL 1,884,000 3,595,000  
* Assumes a basement


Key
State State Capital Improvement Program (State General Obligation Bonds, USM Academic Revenue Bonds)
System System Funded Construction Program (student/faculty/staff fees)
Institutional Institutional Funds
Facilities Renewal Facilities Renewal Program (projects over $1M)
Private Private fundraising
PPP Public-Private Partnership (private developer financing)
R Renewal of entire facility.
r Partial renewal of the facility.
* Estimated cost is in thousands in January 2002 dollars.
** Facility to be relocated to University property near College Park metro station.
District  
C Campuswide/Various Areas
E East Campus District
HC Historic Core District
N North District
NE Northeast District
NW Northwest District
OP Outlying Properties
SW Southwest District
W West District


Master Plan Home

UM Home | UM Holiday Schedule | UM Directories | UM Search | Weather | Div. of Admin. Affairs | ARES
UM Emergency Preparedness | Dept. of Public Safety | Dept. of Environmental Safety | Dept. of Procurement & Supply
Maintained by University of Maryland Facilities Management